Lodestar Space Power

Preferred equity in surface power units for places where solar does not work and batteries freeze.

A lunar night lasts fourteen Earth days and reaches −173 °C. Solar panels produce nothing and batteries do not survive it, which leaves radioisotope and small fission units as the only options for anything that must keep operating. Lodestar has two flown heritage systems and holds study contracts with two civil space agencies.

Front Range Assembly Facility · Golden, CONot applicableEscrow: Cadence Escrow Services
TRL 6 of 9, band 5.5 to 6.6, signed by Dr. Samuel Adeyemi, PhD Nuclear Engineering; ASME Section III reviewer, on Apr 23, 2026.See the evidence it rests on

$4,685,000 committed of $5,000,000

$2,342,500 released · 94% subscribed

Released to the issuerCommitted, held in escrowRemaining
Minimum
$100

$22 per unit

Instrument
Preferred equity
Term
None
Investors
2,874

Closed August 31, 2026

Sign in to see your limit

  • Eligibility depends on residency, accreditation status and how much you have already invested this year.
  • You can read everything about this offering without an account. Committing capital requires one.
Open an account
Open an account to invest

Demo · viewing as

Browsing without an account. Everything is visible; nothing is purchasable until you verify who and where you are.

Or answer the questions yourself

No money will move

No payment processor is connected. The commitment flow runs end to end, through amount, agreement, signature and receipt, and records a simulated position rather than a charge.

6

Technology readiness level, 1 to 9

Confidence band 5.56.6

A qualification unit has completed thermal vacuum and vibration testing, which is prototype demonstration in a relevant environment and therefore level 6. Two prior systems from this team have flown, which narrows the band. The commercial constraint is entirely fuel: plutonium-238 is produced by a single national program in quantities measured in kilograms per year and cannot be purchased.

At TRL 6, the ladder permits Preferred equity and releases up to 50% of committed capital. This offering is structured as a preferred equity, which is consistent with that band.

Signed and published

Reviewer
Dr. Samuel Adeyemi
Credential
PhD Nuclear Engineering; ASME Section III reviewer
Signed
April 23, 2026
Published
April 24, 2026
Methodology
v1.4
Model
ci-trl-2026.06
Generated
Apr 18, 2026

Evidence

Every score cites the documents it was derived from, with the weight each carried. An assessment without evidence is an opinion.

SourceDocumentDateWeight
Independent test report

Thermal vacuum and vibration qualification, engineering unit

Independent environmental test report to spaceflight protocol

Unit survived launch loads and operated to specification in vacuum.

Mar 8, 202636%
Metered output

Flight heritage, two prior systems

Mission telemetry, prior generation hardware

Both systems met power output specification through mission life.

Dec 1, 202527%
Supplier contract

Two civil space agency study contracts

Executed study contracts, no production commitment

Study scope only. Production orders are not committed.

Feb 14, 202621%
Independent test report

Thermoelectric converter efficiency characterization

Issuer test records with independent verification

Conversion efficiency consistent with design projections.

Aug 19, 202516%

Score history

A score changes on the day a reviewer signs a new assessment, which is why this is a step line rather than a curve.

13579May 2024Jul 2025Apr 2026