Skip to content
DemonstrationReset
Reg CFTRL65.56.6Tier IOpen

Lodestar Space Power

Preferred equity in surface power units for places where solar does not work and batteries freeze.

A lunar night lasts fourteen Earth days and reaches −173 °C. Solar panels produce nothing and batteries do not survive it, which leaves radioisotope and small fission units as the only options for anything that must keep operating. Lodestar has two flown heritage systems and holds study contracts with two civil space agencies.

Front Range Assembly Facility · Golden, CONot applicableEscrow: Cadence Escrow Services
TRL 6 of 9, band 5.5 to 6.6, signed by Dr. Samuel Adeyemi, PhD Nuclear Engineering; ASME Section III reviewer, on Apr 23, 2026.See the evidence it rests on

$4,685,000 committed of $5,000,000

$2,342,500 released · 94% subscribed

Released to the issuerCommitted, held in escrowRemaining
Minimum
$100

$22 per unit

Instrument
Preferred equity
Term
None
Investors
2,874

Closed August 31, 2026

Sign in to see your limit

  • Eligibility depends on residency, accreditation status and how much you have already invested this year.
  • You can read everything about this offering without an account. Committing capital requires one.
Open an account
Open an account to invest

Demo · viewing as

Browsing without an account. Everything is visible; nothing is purchasable until you verify who and where you are.

Or answer the questions yourself

No money will move

No payment processor is connected. The commitment flow runs end to end, through amount, agreement, signature and receipt, and records a simulated position rather than a charge.

Offering documents

The filing set is determined by the rail. This offering is a Regulation Crowdfunding offering.

  • Form C offering statement

    Form C · 12 pages · filed Mar 16, 2026

    Not available in demo
  • Subscription agreement

    Agreement · 49 pages · filed Mar 16, 2026

    Not available in demo
  • Audited financial statements

    Financials · 86 pages · filed Mar 16, 2026

    Not available in demo
  • TRL assessment report

    TRL report · 123 pages · filed Mar 16, 2026

    Not available in demo
  • Milestone and capital release schedule

    Schedule · 160 pages · filed Mar 16, 2026

    Not available in demo