Skip to content
DemonstrationReset
Reg CFTRL65.56.6Tier IOpen

Lodestar Space Power

Preferred equity in surface power units for places where solar does not work and batteries freeze.

A lunar night lasts fourteen Earth days and reaches −173 °C. Solar panels produce nothing and batteries do not survive it, which leaves radioisotope and small fission units as the only options for anything that must keep operating. Lodestar has two flown heritage systems and holds study contracts with two civil space agencies.

Front Range Assembly Facility · Golden, CONot applicableEscrow: Cadence Escrow Services
TRL 6 of 9, band 5.5 to 6.6, signed by Dr. Samuel Adeyemi, PhD Nuclear Engineering; ASME Section III reviewer, on Apr 23, 2026.See the evidence it rests on

$4,685,000 committed of $5,000,000

$2,342,500 released · 94% subscribed

Released to the issuerCommitted, held in escrowRemaining
Minimum
$100

$22 per unit

Instrument
Preferred equity
Term
None
Investors
2,874

Closed August 31, 2026

Sign in to see your limit

  • Eligibility depends on residency, accreditation status and how much you have already invested this year.
  • You can read everything about this offering without an account. Committing capital requires one.
Open an account
Open an account to invest

Demo · viewing as

Browsing without an account. Everything is visible; nothing is purchasable until you verify who and where you are.

Or answer the questions yourself

No money will move

No payment processor is connected. The commitment flow runs end to end, through amount, agreement, signature and receipt, and records a simulated position rather than a charge.

1 of 2 rungs released

Release is structured as staged closings rather than withheld proceeds. Amounts shown are cumulative against the $4.7M committed to this offering.

  1. Engineering unit environmental qualification

    Capital released
    TRL target
    TRL 6
    Cumulative release
    50% · $2,342,500
    Certified
    March 24, 2026

    Verified by: Independent thermal vacuum and vibration test report

    Certifier: Cordell Independent Verification

  2. Flight unit delivered under contract

    Pending
    TRL target
    TRL 8
    Cumulative release
    90% · $4,216,500
    Target
    June 30, 2030

    Verified by: Customer acceptance of a flight article

Committed
$4,685,000

Held by the escrow agent on subscription

Released to the issuer
$2,342,500

50% of committed capital

Still escrowed
$2,342,500

Unlocks on the next certification

Escrow agent: Cadence Escrow Services. Certification is performed by an independent party with no economic interest in the release.