Skip to content
DemonstrationReset
Reg CFTRL65.36.4Tier IOpen

Sable Fast Reactor, Series B

Preferred equity in a sodium fast reactor with integrated salt storage, siting where a coal plant already has the transmission.

A fast spectrum needs no moderator, and sodium at atmospheric pressure removes the high-pressure containment problem. Bolting a molten salt heat store onto the secondary side turns a baseload machine into one that can follow load and sell into peak pricing. Siting at a retiring coal plant inherits the switchyard, the transmission rights and the workforce.

Hams Fork Energy Center · Kemmerer, WYConstruction permit filedEscrow: Cadence Escrow Services
TRL 6 of 9, band 5.3 to 6.4, signed by Dr. Samuel Adeyemi, PhD Nuclear Engineering; ASME Section III reviewer, on Apr 18, 2026.See the evidence it rests on

$4,410,000 committed of $5,000,000

$2,205,000 released · 88% subscribed

Released to the issuerCommitted, held in escrowRemaining
Minimum
$100

$18 per unit

Instrument
Preferred equity
Term
None
Investors
2,218

Closes September 15, 2026 · 2 days remaining

Sign in to see your limit

  • Eligibility depends on residency, accreditation status and how much you have already invested this year.
  • You can read everything about this offering without an account. Committing capital requires one.
Open an account
Open an account to invest

Demo · viewing as

Browsing without an account. Everything is visible; nothing is purchasable until you verify who and where you are.

Or answer the questions yourself

No money will move

No payment processor is connected. The commitment flow runs end to end, through amount, agreement, signature and receipt, and records a simulated position rather than a charge.

Issuer updates

This issuer has not posted an update yet.