Sable Fast Reactor, Series B

Preferred equity in a sodium fast reactor with integrated salt storage, siting where a coal plant already has the transmission.

A fast spectrum needs no moderator, and sodium at atmospheric pressure removes the high-pressure containment problem. Bolting a molten salt heat store onto the secondary side turns a baseload machine into one that can follow load and sell into peak pricing. Siting at a retiring coal plant inherits the switchyard, the transmission rights and the workforce.

Hams Fork Energy Center · Kemmerer, WYConstruction permit filedEscrow: Cadence Escrow Services
TRL 6 of 9, band 5.3 to 6.4, signed by Dr. Samuel Adeyemi, PhD Nuclear Engineering; ASME Section III reviewer, on Apr 18, 2026.See the evidence it rests on

$4,410,000 committed of $5,000,000

$2,205,000 released · 88% subscribed

Released to the issuerCommitted, held in escrowRemaining
Minimum
$100

$18 per unit

Instrument
Preferred equity
Term
None
Investors
2,218

Closes September 15, 2026 · 2 days remaining

Sign in to see your limit

  • Eligibility depends on residency, accreditation status and how much you have already invested this year.
  • You can read everything about this offering without an account. Committing capital requires one.
Open an account
Open an account to invest

Demo · viewing as

Browsing without an account. Everything is visible; nothing is purchasable until you verify who and where you are.

Or answer the questions yourself

No money will move

No payment processor is connected. The commitment flow runs end to end, through amount, agreement, signature and receipt, and records a simulated position rather than a charge.

6

Technology readiness level, 1 to 9

Confidence band 5.36.4

A prototype sodium loop with representative components has operated at temperature under third-party witness, which is what level 6 describes. Sodium fast reactors have operating precedent going back decades, so the physics is not the question; the fuel supply and the license are. On the commercial side there is a letter of intent rather than a contract, and a HALEU supply chain that is itself under construction.

At TRL 6, the ladder permits Preferred equity and releases up to 50% of committed capital. This offering is structured as a preferred equity, which is consistent with that band.

Signed and published

Reviewer
Dr. Samuel Adeyemi
Credential
PhD Nuclear Engineering; ASME Section III reviewer
Signed
April 18, 2026
Published
April 19, 2026
Methodology
v1.4
Model
ci-trl-2026.06
Generated
Apr 13, 2026

Evidence

Every score cites the documents it was derived from, with the weight each carried. An assessment without evidence is an opinion.

SourceDocumentDateWeight
Independent test report

Integrated sodium loop, witnessed 1,500-hour campaign

Independent witness test report, prototypic components

Pump, intermediate heat exchanger and purification system performed to specification.

Feb 27, 202635%
National lab result

Metallic fuel irradiation data, legacy and current campaigns

National laboratory archive plus current campaign interim results

Historical metallic fuel performance supports the design burnup target.

Nov 20, 202528%
NRC docket

Pre-application topical reports accepted

NRC pre-application engagement, three topical reports

Application not yet docketed. Topical review in progress.

Mar 30, 202622%
DOE award

Advanced reactor demonstration cost-share award

DOE award with milestone structure

Federal cost share is milestone-gated and does not guarantee later tranches.

Sep 5, 202415%

Score history

A score changes on the day a reviewer signs a new assessment, which is why this is a step line rather than a curve.

13579Jun 2024May 2025Apr 2026