Sable Fast Reactor, Series B

Preferred equity in a sodium fast reactor with integrated salt storage, siting where a coal plant already has the transmission.

A fast spectrum needs no moderator, and sodium at atmospheric pressure removes the high-pressure containment problem. Bolting a molten salt heat store onto the secondary side turns a baseload machine into one that can follow load and sell into peak pricing. Siting at a retiring coal plant inherits the switchyard, the transmission rights and the workforce.

Hams Fork Energy Center · Kemmerer, WYConstruction permit filedEscrow: Cadence Escrow Services
TRL 6 of 9, band 5.3 to 6.4, signed by Dr. Samuel Adeyemi, PhD Nuclear Engineering; ASME Section III reviewer, on Apr 18, 2026.See the evidence it rests on

$4,410,000 committed of $5,000,000

$2,205,000 released · 88% subscribed

Released to the issuerCommitted, held in escrowRemaining
Minimum
$100

$18 per unit

Instrument
Preferred equity
Term
None
Investors
2,218

Closes September 15, 2026 · 2 days remaining

Sign in to see your limit

  • Eligibility depends on residency, accreditation status and how much you have already invested this year.
  • You can read everything about this offering without an account. Committing capital requires one.
Open an account
Open an account to invest

Demo · viewing as

Browsing without an account. Everything is visible; nothing is purchasable until you verify who and where you are.

Or answer the questions yourself

No money will move

No payment processor is connected. The commitment flow runs end to end, through amount, agreement, signature and receipt, and records a simulated position rather than a charge.

1 of 3 rungs released

Release is structured as staged closings rather than withheld proceeds. Amounts shown are cumulative against the $4.4M committed to this offering.

  1. Sodium loop campaign certified

    Capital released
    TRL target
    TRL 6
    Cumulative release
    50% · $2,205,000
    Certified
    March 9, 2026

    Verified by: Third-party witness test of the integrated sodium loop

    Certifier: Cordell Independent Verification

  2. Construction permit application docketed

    Awaiting certification
    TRL target
    TRL 6
    Cumulative release
    65% · $2,866,500
    Target
    December 31, 2026

    Verified by: NRC acceptance for docketing

  3. Fuel qualification complete

    Pending
    TRL target
    TRL 7
    Cumulative release
    70% · $3,087,000
    Target
    June 30, 2029

    Verified by: Irradiation campaign final report; NRC construction permit

Committed
$4,410,000

Held by the escrow agent on subscription

Released to the issuer
$2,205,000

50% of committed capital

Still escrowed
$2,205,000

Unlocks on the next certification

Escrow agent: Cadence Escrow Services. Certification is performed by an independent party with no economic interest in the release.