Sable Fast Reactor
Sable Fast Reactor, Series B
Preferred equity in a sodium fast reactor with integrated salt storage, siting where a coal plant already has the transmission.
A fast spectrum needs no moderator, and sodium at atmospheric pressure removes the high-pressure containment problem. Bolting a molten salt heat store onto the secondary side turns a baseload machine into one that can follow load and sell into peak pricing. Siting at a retiring coal plant inherits the switchyard, the transmission rights and the workforce.
$4,410,000 committed of $5,000,000
$2,205,000 released · 88% subscribed
- Minimum
- $100
- Instrument
- Preferred equity
- Term
- None
- Investors
- 2,218
$18 per unit
Closes September 15, 2026 · 2 days remaining
Sign in to see your limit
- Eligibility depends on residency, accreditation status and how much you have already invested this year.
- You can read everything about this offering without an account. Committing capital requires one.
Demo · viewing as
Browsing without an account. Everything is visible; nothing is purchasable until you verify who and where you are.
Or answer the questions yourselfNo money will move
No payment processor is connected. The commitment flow runs end to end, through amount, agreement, signature and receipt, and records a simulated position rather than a charge.
Capital release schedule
1 of 3 rungs released
Release is structured as staged closings rather than withheld proceeds. Amounts shown are cumulative against the $4.4M committed to this offering.
Sodium loop campaign certified
Capital released- TRL target
- TRL 6
- Cumulative release
- 50% · $2,205,000
- Certified
- March 9, 2026
Verified by: Third-party witness test of the integrated sodium loop
Certifier: Cordell Independent Verification
Construction permit application docketed
Awaiting certification- TRL target
- TRL 6
- Cumulative release
- 65% · $2,866,500
- Target
- December 31, 2026
Verified by: NRC acceptance for docketing
Fuel qualification complete
Pending- TRL target
- TRL 7
- Cumulative release
- 70% · $3,087,000
- Target
- June 30, 2029
Verified by: Irradiation campaign final report; NRC construction permit
Held by the escrow agent on subscription
50% of committed capital
Unlocks on the next certification
Escrow agent: Cadence Escrow Services. Certification is performed by an independent party with no economic interest in the release.