Tidewater Hull 001

A reactor built in a shipyard and towed to a berth. Shipyards have a learning curve; construction sites do not.

The reason nuclear construction costs what it does is that every plant is a bespoke first-of-a-kind built outdoors by a workforce assembled for the occasion. A floating unit is built in a shipyard by people who build ships, under cover, on a production line, then towed to site. A barge also solves seismic isolation and cooling water access simultaneously.

Mobile Bay Shipyard · Mobile, ALPre-applicationEscrow: Cadence Escrow Services
TRL 5 of 9, band 4.2 to 5.8, signed by Dr. Helena Vargas-Mbeki, PE, Nuclear; former NRC senior reactor analyst, on May 28, 2026.See the evidence it rests on

$3,215,000 committed of $5,000,000

$964,500 released · 64% subscribed

Released to the issuerCommitted, held in escrowRemaining
Minimum
$100

$25 per unit

Target coupon
6.00%

Annual, fixed

Term
4 yr
Investors
1,902

Closes December 15, 2026 · 93 days remaining

Sign in to see your limit

  • Eligibility depends on residency, accreditation status and how much you have already invested this year.
  • You can read everything about this offering without an account. Committing capital requires one.
Open an account
Open an account to invest

Demo · viewing as

Browsing without an account. Everything is visible; nothing is purchasable until you verify who and where you are.

Or answer the questions yourself

No money will move

No payment processor is connected. The commitment flow runs end to end, through amount, agreement, signature and receipt, and records a simulated position rather than a charge.

5

Technology readiness level, 1 to 9

Confidence band 4.25.8

The reactor is a conventional pressurised water design with substantial operating precedent; what is unproven is the marine platform and the licensing pathway for it. Hull and containment integration has been validated against wave loading in tank testing, supporting level 5. Commercially there is a port authority term sheet rather than an executed agreement, and a regulatory route no United States applicant has completed.

At TRL 5, the ladder permits Convertible note and releases up to 30% of committed capital. This offering is structured as a convertible note, which is consistent with that band.

Signed and published

Reviewer
Dr. Helena Vargas-Mbeki
Credential
PE, Nuclear; former NRC senior reactor analyst
Signed
May 28, 2026
Published
May 29, 2026
Methodology
v1.4
Model
ci-trl-2026.06
Generated
May 23, 2026

Evidence

Every score cites the documents it was derived from, with the weight each carried. An assessment without evidence is an opinion.

SourceDocumentDateWeight
Independent test report

Scale model wave loading and mooring response

Independent hydrodynamic tank test report

Motion response within design limits for the specified hundred-year sea state.

Apr 2, 202634%
NRC docket

Pre-application engagement on marine siting

NRC pre-application meeting summaries

Regulator confirmed no existing licensing framework for a floating commercial unit; approach under discussion.

Mar 18, 202627%
Independent test report

Shipyard production TRL assessment

Independent industrial engineering assessment

Yard capable of the hull scope with identified capital additions.

Nov 27, 202523%
Supplier contract

Port authority electrification term sheet

Non-binding term sheet

Non-binding. No executed offtake exists.

Jan 30, 202616%

Score history

A score changes on the day a reviewer signs a new assessment, which is why this is a step line rather than a curve.

13579Dec 2024Oct 2025May 2026