Skip to content
DemonstrationReset
Reg D 506(c)TRL65.26.6Tier IOpen

Lumen Isotope Separation

Preferred equity in laser enrichment. A tenth of the energy of a centrifuge cascade, and a proliferation argument to answer.

Selective photoionisation excites one uranium isotope and not the other, which separates them in a single stage rather than the thousands of cascade stages a centrifuge plant requires. The energy saving is roughly an order of magnitude. The same property that makes it efficient, namely a small, low-signature facility, is precisely what makes non-proliferation specialists uneasy, and the licensing pathway reflects that.

Cape Fear Nuclear Campus · Wilmington, NCPre-applicationEscrow: Meridian Trust, N.A.
TRL 6 of 9, band 5.2 to 6.6, signed by Dr. Samuel Adeyemi, PhD Nuclear Engineering; ASME Section III reviewer, on Jun 18, 2026.See the evidence it rests on

$21,700,000 committed of $35,000,000

$10,850,000 released · 62% subscribed

Released to the issuerCommitted, held in escrowRemaining
Minimum
$25,000

$500 per unit

Instrument
Preferred equity
Term
None
Investors
79

Closes February 15, 2027 · 155 days remaining

Sign in to see your limit

  • Eligibility depends on residency, accreditation status and how much you have already invested this year.
  • You can read everything about this offering without an account. Committing capital requires one.
Open an account
Open an account to invest

Demo · viewing as

Browsing without an account. Everything is visible; nothing is purchasable until you verify who and where you are.

Or answer the questions yourself

No money will move

No payment processor is connected. The commitment flow runs end to end, through amount, agreement, signature and receipt, and records a simulated position rather than a charge.

6

Technology readiness level, 1 to 9

Confidence band 5.26.6

A separation module has demonstrated target enrichment on a representative feed under witness, which is prototype demonstration in a relevant environment and therefore level 6. The band is wide because scale-up from module to cascade is where previous laser enrichment programs have failed, several of them very well funded. Commercially there are conditional supply agreements and a licensing pathway complicated by proliferation sensitivity rather than by engineering.

At TRL 6, the ladder permits Preferred equity and releases up to 50% of committed capital. This offering is structured as a preferred equity, which is consistent with that band.

Signed and published

Reviewer
Dr. Samuel Adeyemi
Credential
PhD Nuclear Engineering; ASME Section III reviewer
Signed
June 18, 2026
Published
June 19, 2026
Methodology
v1.4
Model
ci-trl-2026.06
Generated
Jun 13, 2026

Evidence

Every score cites the documents it was derived from, with the weight each carried. An assessment without evidence is an opinion.

SourceDocumentDateWeight
Independent test report

Separation module enrichment demonstration, witnessed

Independent witness test report on representative feed

Target assay achieved in a single stage at reported separative capacity.

Apr 11, 202635%
Peer-reviewed publication

Selective photoionisation cross-section measurements

Peer-reviewed spectroscopy literature

Isotopic selectivity confirmed independently at the operating wavelength.

Oct 2, 202526%
NRC docket

Pre-application and safeguards engagement

NRC pre-application; international safeguards consultation

Safeguards approach under discussion. No application docketed.

May 6, 202623%
Supplier contract

Two conditional supply agreements

Agreements conditional on facility licensing and completion

Conditions precedent include an operating license that does not exist.

Feb 28, 202616%

Score history

A score changes on the day a reviewer signs a new assessment, which is why this is a step line rather than a curve.

13579Jul 2024Aug 2025Jun 2026