Hearth Microreactor, Series A

Preferred equity in a five megawatt heat-pipe reactor with a witnessed prototype and no pumps to fail.

Heat pipes move heat by evaporation and condensation inside a sealed tube. No pumps, no coolant loop, no loss-of-flow accident to design against. Hearth has demonstrated a full-power thermal prototype under third-party witness at a national laboratory and is preparing a construction permit application for a five megawatt unit at Idaho Falls.

Idaho Innovation Campus · Idaho Falls, IDConstruction permit filedEscrow: Cadence Escrow Services
TRL 6 of 9, band 5.4 to 6.5, signed by Dr. Samuel Adeyemi, PhD Nuclear Engineering; ASME Section III reviewer, on Jun 9, 2026.See the evidence it rests on

$3,860,000 committed of $5,000,000

$1,930,000 released · 77% subscribed

Released to the issuerCommitted, held in escrowRemaining
Minimum
$100

$13 per unit

Instrument
Preferred equity
Term
None
Investors
1,412

Closes October 15, 2026 · 32 days remaining

Sign in to see your limit

  • Eligibility depends on residency, accreditation status and how much you have already invested this year.
  • You can read everything about this offering without an account. Committing capital requires one.
Open an account
Open an account to invest

Demo · viewing as

Browsing without an account. Everything is visible; nothing is purchasable until you verify who and where you are.

Or answer the questions yourself

No money will move

No payment processor is connected. The commitment flow runs end to end, through amount, agreement, signature and receipt, and records a simulated position rather than a charge.

1 of 4 rungs released

Release is structured as staged closings rather than withheld proceeds. Amounts shown are cumulative against the $3.9M committed to this offering.

  1. Witnessed thermal prototype at full power

    Capital released
    TRL target
    TRL 6
    Cumulative release
    50% · $1,930,000
    Certified
    June 30, 2026

    Verified by: Third-party witness test report

    Certifier: Cordell Independent Verification

  2. TRISO fuel qualification to target burnup

    Pending
    TRL target
    TRL 6
    Cumulative release
    65% · $2,509,000
    Target
    September 30, 2027

    Verified by: Advanced test reactor irradiation campaign, final report

  3. Construction permit issued

    Pending
    TRL target
    TRL 7
    Cumulative release
    80% · $3,088,000
    Target
    June 30, 2028

    Verified by: NRC construction permit issuance

  4. First criticality and grid synchronisation

    Pending
    TRL target
    TRL 8
    Cumulative release
    100% · $3,860,000
    Target
    June 30, 2030

    Verified by: Operating license; metered output

Committed
$3,860,000

Held by the escrow agent on subscription

Released to the issuer
$1,930,000

50% of committed capital

Still escrowed
$1,930,000

Unlocks on the next certification

Escrow agent: Cadence Escrow Services. Certification is performed by an independent party with no economic interest in the release.