Ballast Thermal Storage Retrofit

Fixed-rate notes on salt storage bolted onto an operating plant, so a baseload machine can chase the peak price.

A nuclear plant is a machine that produces constant heat, and an electricity market pays wildly varying prices for it. Storing heat in molten salt during cheap hours and drawing it down during expensive ones is arbitrage against the plant's own inflexibility, using equipment already proven at concentrated solar plants. No nuclear license amendment is required because nothing on the nuclear side is modified.

North Platte Generating Station · Casper, WYNot applicableEscrow: Meridian Trust, N.A.
TRL 8 of 9, band 7.6 to 8.5, signed by Dr. Samuel Adeyemi, PhD Nuclear Engineering; ASME Section III reviewer, on Apr 9, 2026.See the evidence it rests on

$20,240,000 committed of $22,000,000

$18,216,000 released · 92% subscribed

Released to the issuerCommitted, held in escrowRemaining
Minimum
$500

$100 per unit

Target coupon
6.45%

Annual, fixed

Term
5 yr
Investors
2,961

Closed August 14, 2026

Sign in to see your limit

  • Eligibility depends on residency, accreditation status and how much you have already invested this year.
  • You can read everything about this offering without an account. Committing capital requires one.
Open an account
Open an account to invest

Demo · viewing as

Browsing without an account. Everything is visible; nothing is purchasable until you verify who and where you are.

Or answer the questions yourself

No money will move

No payment processor is connected. The commitment flow runs end to end, through amount, agreement, signature and receipt, and records a simulated position rather than a charge.

8

Technology readiness level, 1 to 9

Confidence band 7.68.5

Molten salt thermal storage is commercially proven at concentrated solar plants and this system is complete and undergoing commissioning, which is level 8. Nothing on the nuclear side is modified, so no license amendment is required and the regulatory risk is close to nil. The commercial exposure is merchant: the revenue depends on a peak-to-off-peak price spread that competing storage will erode.

At TRL 8, the ladder permits Fixed-rate note or Municipal mini-bond and releases up to 90% of committed capital. This offering is structured as a fixed-rate note, which is consistent with that band.

Signed and published

Reviewer
Dr. Samuel Adeyemi
Credential
PhD Nuclear Engineering; ASME Section III reviewer
Signed
April 9, 2026
Published
April 10, 2026
Methodology
v1.4
Model
ci-trl-2026.06
Generated
Apr 4, 2026

Evidence

Every score cites the documents it was derived from, with the weight each carried. An assessment without evidence is an opinion.

SourceDocumentDateWeight
Independent test report

Salt loop commissioning and thermal cycling

Independent commissioning report

Charge and discharge cycles achieved rated capacity with expected losses.

Feb 19, 202634%
Metered output

Commercial precedent, concentrated solar storage installations

Published operating data, comparable salt storage plants

Equipment class has a multi-decade commercial operating record.

Oct 30, 202526%
Independent test report

Host plant steam extraction impact study

Independent engineering study, host operator reviewed

No modification to safety-related systems; no license amendment required.

Jan 14, 202624%
Supplier contract

Market participation and dispatch agreement

Executed agreement with the organized market operator

Registered as a storage resource. No capacity payment floor.

Dec 5, 202516%

Score history

A score changes on the day a reviewer signs a new assessment, which is why this is a step line rather than a curve.

13579Nov 2024Sep 2025Apr 2026