Thermogen Baytown Hydrogen

Senior notes on process heat and hydrogen sold to refiners under executed offtake, not electricity sold to a grid.

Roughly a quarter of industrial energy demand is heat, not electricity, and a high-temperature gas reactor delivers 750 °C directly. Selling process heat and hydrogen to refiners avoids the wholesale power market, the interconnection queue and the merchant pricing risk entirely. Two refiners have executed offtake agreements with volume floors.

Cedar Bayou Industrial Complex · Baytown, TXConstruction permit filedEscrow: Meridian Trust, N.A.
TRL 7 of 9, band 6.5 to 7.4, signed by Dr. Helena Vargas-Mbeki, PE, Nuclear; former NRC senior reactor analyst, on Apr 30, 2026.See the evidence it rests on

$41,600,000 committed of $65,000,000

$29,120,000 released · 64% subscribed

Released to the issuerCommitted, held in escrowRemaining
Minimum
$500

$100 per unit

Target coupon
7.05%

Annual, fixed

Term
8 yr
Investors
4,517

Closes January 29, 2027 · 138 days remaining

Sign in to see your limit

  • Eligibility depends on residency, accreditation status and how much you have already invested this year.
  • You can read everything about this offering without an account. Committing capital requires one.
Open an account
Open an account to invest

Demo · viewing as

Browsing without an account. Everything is visible; nothing is purchasable until you verify who and where you are.

Or answer the questions yourself

No money will move

No payment processor is connected. The commitment flow runs end to end, through amount, agreement, signature and receipt, and records a simulated position rather than a charge.

7

Technology readiness level, 1 to 9

Confidence band 6.57.4

The reactor technology is well evidenced and the thermochemical hydrogen process has operated at pilot scale under witness, placing this at level 7. Two refiners have executed offtake with volume floors, so the demand side is more certain than the plant, which is the reverse of the usual position. The construction permit is filed and not issued, which is what holds the technical score where it is.

At TRL 7, the ladder permits Senior note and releases up to 70% of committed capital. This offering is structured as a senior note, which is consistent with that band.

Signed and published

Reviewer
Dr. Helena Vargas-Mbeki
Credential
PE, Nuclear; former NRC senior reactor analyst
Signed
April 30, 2026
Published
May 1, 2026
Methodology
v1.4
Model
ci-trl-2026.06
Generated
Apr 25, 2026

Evidence

Every score cites the documents it was derived from, with the weight each carried. An assessment without evidence is an opinion.

SourceDocumentDateWeight
Independent test report

Thermochemical hydrogen pilot, witnessed campaign

Independent witness test report, sulfur-iodine cycle

Pilot achieved target hydrogen yield at prototypical inlet temperature.

Mar 13, 202631%
Supplier contract

Two executed hydrogen offtake agreements

Refiner agreements with volume floors and indexed pricing

Floors cover 74% of nameplate hydrogen output for ten years.

Feb 20, 202630%
NRC docket

Construction permit application docketed

NRC docket, acceptance review complete

Accepted for docketing. Safety review in progress.

Jan 27, 202623%
National lab result

TRISO compact performance data

National laboratory irradiation results

Performance consistent with the qualified TRISO database.

Jul 24, 202516%

Score history

A score changes on the day a reviewer signs a new assessment, which is why this is a step line rather than a curve.

13579Sep 2024Aug 2025May 2026