Quanta Campus Unit 1

Senior notes on a behind-the-meter reactor inside a data center campus, with a twenty-year executed offtake.

The binding constraint on data center expansion is no longer chips or capital, it is a grid interconnection queue measured in years. Siting generation inside the fence removes the queue entirely and gives the tenant a twenty-year fixed cost of power. One hyperscale counterparty has executed the agreement, which is both the strength and the weakness of this offering.

Loudoun Compute Campus · Ashburn, VAConstruction permit filedEscrow: Meridian Trust, N.A.
TRL 7 of 9, band 6.6 to 7.4, signed by Dr. Helena Vargas-Mbeki, PE, Nuclear; former NRC senior reactor analyst, on Apr 29, 2026.See the evidence it rests on

$58,100,000 committed of $70,000,000

$40,670,000 released · 83% subscribed

Released to the issuerCommitted, held in escrowRemaining
Minimum
$1,000

$100 per unit

Target coupon
6.65%

Annual, fixed

Term
10 yr
Investors
6,318

Closes December 19, 2026 · 97 days remaining

Sign in to see your limit

  • Eligibility depends on residency, accreditation status and how much you have already invested this year.
  • You can read everything about this offering without an account. Committing capital requires one.
Open an account
Open an account to invest

Demo · viewing as

Browsing without an account. Everything is visible; nothing is purchasable until you verify who and where you are.

Or answer the questions yourself

No money will move

No payment processor is connected. The commitment flow runs end to end, through amount, agreement, signature and receipt, and records a simulated position rather than a charge.

7

Technology readiness level, 1 to 9

Confidence band 6.67.4

The reactor is a licensed design with a completed first-of-a-kind elsewhere, and the campus integration engineering is complete, which supports level 7. A single hyperscale tenant has executed a twenty-year agreement, the strongest offtake on the platform and simultaneously its most concentrated credit exposure. The construction permit is filed and not issued.

At TRL 7, the ladder permits Senior note and releases up to 70% of committed capital. This offering is structured as a senior note, which is consistent with that band.

Signed and published

Reviewer
Dr. Helena Vargas-Mbeki
Credential
PE, Nuclear; former NRC senior reactor analyst
Signed
April 29, 2026
Published
April 30, 2026
Methodology
v1.4
Model
ci-trl-2026.06
Generated
Apr 24, 2026

Evidence

Every score cites the documents it was derived from, with the weight each carried. An assessment without evidence is an opinion.

SourceDocumentDateWeight
Supplier contract

Twenty-year power and capacity agreement, single tenant

Executed agreement with a hyperscale operator

Fixed price with inflation adjustment; take-or-pay above a minimum load.

Jan 13, 202633%
NRC docket

Construction permit application docketed

NRC docket, acceptance review complete

Safety review in progress. Standard design approval referenced.

Dec 4, 202528%
Operating license

Referenced standard design approval

Previously approved standard design for the module

Reduces first-of-a-kind design review scope substantially.

Oct 21, 202424%
Independent test report

Campus integration and islanding study

Independent electrical engineering study

Behind-the-meter configuration demonstrated stable under modeled load steps.

Mar 6, 202615%

Score history

A score changes on the day a reviewer signs a new assessment, which is why this is a step line rather than a curve.

13579Nov 2024Dec 2025Apr 2026