Skip to content
DemonstrationReset
Reg A+TRL87.78.4Tier IIOpen

Lantern Production Line Two

Fixed-rate notes on medical isotope production. No reactor, no fuel, and a customer base that cannot substitute.

Molybdenum-99 decays into the technetium-99m used in roughly forty million diagnostic scans a year, and it has historically come from a handful of aging research reactors, two of which have gone offline unexpectedly and caused global shortages. Accelerator production needs no reactor and no fissile fuel, and its output has a 66-hour half-life, which means the product cannot be stockpiled and customers cannot switch suppliers on short notice. Line one is in commercial operation; this funds line two.

Tri-Valley Isotope Facility · Livermore, CAOperating license issuedEscrow: Meridian Trust, N.A.
TRL 8 of 9, band 7.7 to 8.4, signed by Dr. Samuel Adeyemi, PhD Nuclear Engineering; ASME Section III reviewer, on May 10, 2026.See the evidence it rests on

$12,240,000 committed of $18,000,000

$11,016,000 released · 68% subscribed

Released to the issuerCommitted, held in escrowRemaining
Minimum
$500

$100 per unit

Target coupon
6.15%

Annual, fixed

Term
6 yr
Investors
2,483

Closes February 26, 2027 · 166 days remaining

Sign in to see your limit

  • Eligibility depends on residency, accreditation status and how much you have already invested this year.
  • You can read everything about this offering without an account. Committing capital requires one.
Open an account
Open an account to invest

Demo · viewing as

Browsing without an account. Everything is visible; nothing is purchasable until you verify who and where you are.

Or answer the questions yourself

No money will move

No payment processor is connected. The commitment flow runs end to end, through amount, agreement, signature and receipt, and records a simulated position rather than a charge.

8

Technology readiness level, 1 to 9

Confidence band 7.78.4

Line one is in commercial operation and qualified with three distributors, and line two is a replication of a working system rather than a new design, which is what level 8 describes. The residual risk is operational rather than developmental: a single accelerator, a product that cannot be stored, and reimbursement rates set by third parties.

At TRL 8, the ladder permits Fixed-rate note or Municipal mini-bond and releases up to 90% of committed capital. This offering is structured as a fixed-rate note, which is consistent with that band.

Signed and published

Reviewer
Dr. Samuel Adeyemi
Credential
PhD Nuclear Engineering; ASME Section III reviewer
Signed
May 10, 2026
Published
May 11, 2026
Methodology
v1.4
Model
ci-trl-2026.06
Generated
May 5, 2026

Evidence

Every score cites the documents it was derived from, with the weight each carried. An assessment without evidence is an opinion.

SourceDocumentDateWeight
Metered output

Line one production and shipment record

Batch release records; distributor acceptance

Sustained yield and radiochemical purity within specification across released batches.

Mar 28, 202638%
Operating license

Radioactive materials license and pharmaceutical quality approval

State radiologic health license; facility quality system approval

Licensed for production and distribution with no open findings.

Sep 12, 202529%
Supplier contract

Three distributor agreements with take-or-pay volumes

Executed multi-year radiopharmacy agreements

Contracted volumes exceed line one capacity, which is the case for line two.

Jan 23, 202621%
Independent test report

Target station thermal and yield qualification

Independent engineering verification of the line two target design

Second target station design verified against line one operating data.

Apr 17, 202612%

Score history

A score changes on the day a reviewer signs a new assessment, which is why this is a step line rather than a curve.

13579Jun 2024May 2025May 2026