Skip to content
DemonstrationReset
Reg D 506(c)TRL76.67.5Tier IIOpen

Castellan Defense Systems

Senior notes on a transportable gas-cooled microreactor under a defense prototyping contract. Accredited only.

Roughly half of the casualties in recent land campaigns occurred in or around fuel convoys. A three megawatt reactor that fits in shipping containers and runs for five years without refueling removes that convoy. Castellan holds a construction permit under Department of Energy authorization and a prototyping contract with options for eight units.

New River Defense Complex · Radford, VAConstruction permit issuedEscrow: Meridian Trust, N.A.
TRL 7 of 9, band 6.6 to 7.5, signed by Dr. Helena Vargas-Mbeki, PE, Nuclear; former NRC senior reactor analyst, on Jun 4, 2026.See the evidence it rests on

$24,900,000 committed of $30,000,000

$17,430,000 released · 83% subscribed

Released to the issuerCommitted, held in escrowRemaining
Minimum
$25,000

$1,000 per unit

Target coupon
7.15%

Annual, fixed

Term
6 yr
Investors
88

Closes November 15, 2026 · 63 days remaining

Sign in to see your limit

  • Eligibility depends on residency, accreditation status and how much you have already invested this year.
  • You can read everything about this offering without an account. Committing capital requires one.
Open an account
Open an account to invest

Demo · viewing as

Browsing without an account. Everything is visible; nothing is purchasable until you verify who and where you are.

Or answer the questions yourself

No money will move

No payment processor is connected. The commitment flow runs end to end, through amount, agreement, signature and receipt, and records a simulated position rather than a charge.

7

Technology readiness level, 1 to 9

Confidence band 6.67.5

A construction permit is issued under Department of Energy authorization and a prototype is in fabrication, which is a system prototype heading into an operational environment. High-temperature gas reactors with TRISO fuel have the strongest safety evidence base of any advanced design. The commercial risk is single-customer concentration and options that are not orders.

At TRL 7, the ladder permits Senior note and releases up to 70% of committed capital. This offering is structured as a senior note, which is consistent with that band.

Signed and published

Reviewer
Dr. Helena Vargas-Mbeki
Credential
PE, Nuclear; former NRC senior reactor analyst
Signed
June 4, 2026
Published
June 5, 2026
Methodology
v1.4
Model
ci-trl-2026.06
Generated
May 30, 2026

Evidence

Every score cites the documents it was derived from, with the weight each carried. An assessment without evidence is an opinion.

SourceDocumentDateWeight
NRC docket

Construction authorization issued under DOE authority

DOE authorization basis approval

Authorizes construction and operation of the prototype unit.

Nov 13, 202532%
National lab result

TRISO fuel qualification data, full burnup

Advanced test reactor campaign, final report

Fission product retention maintained to design burnup with margin.

Jun 30, 202530%
Supplier contract

Defense prototyping contract with unit options

Executed contract, options for eight units

Options exercisable at government discretion and not committed volume.

Jan 8, 202624%
Independent test report

Transportability and shock qualification

Independent test report to defense transport standards

Containerised unit met road and air transport shock requirements.

Apr 16, 202614%

Score history

A score changes on the day a reviewer signs a new assessment, which is why this is a step line rather than a curve.

13579Apr 2024Jun 2025Jun 2026