Great Lakes Atomic
Bridgman Community Tranche
The same senior notes in $250 denominations, reserved for Michigan residents.
Bridgman lost roughly nine hundred construction jobs in 1982 and the village never recovered its tax base. This tranche is restricted to Michigan residents under Rule 147A and runs concurrently with the Reg A+ offering under Rule 152. Same seniority, same collateral, a 25 basis point premium and a $250 minimum.
Running concurrently over the same project
Rule 152 permits an issuer to run more than one offering at the same time. The same reactor backs both, on different rails, with different eligibility.
$4,128,000 committed of $6,000,000
$2,889,600 released · 69% subscribed
- Minimum
- $250
- Target coupon
- 7.20%
- Term
- 10 yr
- Investors
- 3,204
$250 per unit
Annual, fixed
Closes March 31, 2027 · 199 days remaining
Sign in to see your limit
- Eligibility depends on residency, accreditation status and how much you have already invested this year.
- You can read everything about this offering without an account. Committing capital requires one.
Demo · viewing as
Browsing without an account. Everything is visible; nothing is purchasable until you verify who and where you are.
Or answer the questions yourselfNo money will move
No payment processor is connected. The commitment flow runs end to end, through amount, agreement, signature and receipt, and records a simulated position rather than a charge.
TRL assessment
7
Technology readiness level, 1 to 9
Confidence band 6.4 – 7.5
The reactor design is a proven operating technology, so the TRL question here is not about physics but about forty-year-old concrete. An independent structural assessment has found the containment and basemat sound, which is what supports a level 7 rather than something lower. The band is wider than a normal operating asset because degradation findings during completion remain possible, and gigawatt-scale construction cost risk remains whatever the engineering confidence, which is a commercial question this scale does not answer.
At TRL 7, the ladder permits Senior note and releases up to 70% of committed capital. This offering is structured as a senior note, which is consistent with that band.
Signed and published
- Reviewer
- Dr. Helena Vargas-Mbeki
- Credential
- PE, Nuclear; former NRC senior reactor analyst
- Signed
- June 10, 2026
- Published
- June 11, 2026
- Methodology
- v1.4
- Model
- ci-trl-2026.06
- Generated
- Jun 5, 2026
Evidence
Every score cites the documents it was derived from, with the weight each carried. An assessment without evidence is an opinion.
| Source | Document | Date | Weight |
|---|---|---|---|
| Independent test report | Independent structural and materials assessment, containment and basemat Third-party engineering assessment, core sampling and ultrasonic survey Concrete compressive strength and rebar condition within original design specification at all sampled locations. | Apr 8, 2026 | 33% |
| NRC docket | Construction permit reinstated on amended docket NRC docket amendment, original construction permit 50-xxx Permit reinstated subject to updated seismic and aging management analysis. | Dec 16, 2025 | 29% |
| Supplier contract | Reactor vessel and steam generator supply agreements Two suppliers, firm fixed price with delivery windows Long-lead components ordered with liquidated damages for late delivery. | Feb 25, 2026 | 24% |
| Supplier contract | Power purchase agreements, three midwestern utilities Executed 25-year contracts Contracted output covers 88% of expected net generation. | Jan 19, 2026 | 14% |
Score history
A score changes on the day a reviewer signs a new assessment, which is why this is a step line rather than a curve.