Skip to content
DemonstrationReset
Reg A+TRL98.89.0Tier IIFully committed

Basin Uranium Production Notes

Fixed-rate notes on an operating in-situ recovery wellfield with five utility supply contracts.

In-situ recovery dissolves uranium in place and pumps it to the surface, so there is no open pit, no waste rock and no tailings impoundment. The facility holds an operating license, is in production, and sells under five indexed utility contracts. Every reactor on this platform needs what this wellfield produces.

Powder River In-Situ Recovery Facility · Moorcroft, WYOperating license issuedEscrow: Meridian Trust, N.A.
TRL 9 of 9, band 8.8 to 9, signed by Dr. Samuel Adeyemi, PhD Nuclear Engineering; ASME Section III reviewer, on Apr 2, 2026.See the evidence it rests on

$28,000,000 committed of $28,000,000

$28,000,000 released · 100% subscribed

Released to the issuerCommitted, held in escrowRemaining
Minimum
$500

$100 per unit

Target coupon
6.60%

Annual, fixed

Term
7 yr
Investors
3,388

Closed May 29, 2026

Sign in to see your limit

  • Eligibility depends on residency, accreditation status and how much you have already invested this year.
  • You can read everything about this offering without an account. Committing capital requires one.
Open an account
Open an account to invest

Demo · viewing as

Browsing without an account. Everything is visible; nothing is purchasable until you verify who and where you are.

Or answer the questions yourself

No money will move

No payment processor is connected. The commitment flow runs end to end, through amount, agreement, signature and receipt, and records a simulated position rather than a charge.

9

Technology readiness level, 1 to 9

Confidence band 8.89.0

In-situ recovery is a mature extraction technology and this wellfield is in production under an operating license with five indexed supply contracts. Evidence is shipped product and settlement data. The risk in this offering is uranium pricing and groundwater restoration obligations, not TRL.

At TRL 9, the ladder permits Revenue share or Fixed-rate note or Municipal mini-bond and releases up to 100% of committed capital. This offering is structured as a fixed-rate note, which is consistent with that band.

Signed and published

Reviewer
Dr. Samuel Adeyemi
Credential
PhD Nuclear Engineering; ASME Section III reviewer
Signed
April 2, 2026
Published
April 3, 2026
Methodology
v1.4
Model
ci-trl-2026.06
Generated
Mar 28, 2026

Evidence

Every score cites the documents it was derived from, with the weight each carried. An assessment without evidence is an opinion.

SourceDocumentDateWeight
Metered output

Production and shipment records, trailing eighteen months

Issuer production records, converter receipts

Sustained production against nameplate with documented converter deliveries.

Mar 31, 202643%
Operating license

Source material license, no open violations

NRC source material license; state UIC permits

Most recent inspection closed with no findings.

Jan 22, 202632%
Supplier contract

Five utility supply contracts, indexed pricing

Executed multi-year agreements

Contracted volume covers the majority of forecast production through 2031.

Sep 30, 202525%

Score history

A score changes on the day a reviewer signs a new assessment, which is why this is a step line rather than a curve.

13579Apr 2024Apr 2025Apr 2026