TRL
Evidence and scores
You cannot set your own TRL, and an investor’s willingness to trust the number depends on that. What you can do is file evidence: a witnessed test, a docket entry, an executed supply contract. A reviewer weighs it, the model proposes a score and a confidence band, and a named engineer signs the result.
File new evidence
In the TRL queue
Waiting on a reviewer. Nothing here has changed a score, and the offering pages still show the assessment that was signed.
ITAAC closure package, structural and containment
ITAAC closure · NRC ML26196A118 · dated Aug 26, 2026
filed Sep 10, 2026SimulatedAll 214 inspections, tests, analyses and acceptance criteria in the structural and containment set are closed, with no open items carried to the operating phase.
Offered in support of level 9 · EV-SEED-OSW