TRL review
Oswego Unit 1
Oswego Energy Center · Oswego, New York · 2 live offerings against this project
New evidence
The assistant needs JavaScript. The queue below works without it.
- ITAAC closure
ITAAC closure package, structural and containment
NRC ML26196A118
Offered at level 9
All 214 inspections, tests, analyses and acceptance criteria in the structural and containment set are closed, with no open items carried to the operating phase.
- Document date
- Aug 26, 2026
- Filed
- Sep 10, 2026
- Weight
- 0.90 of a possible 1.00
- Supports up to
- Level 8
Accepted closure notifications are a regulator agreeing the as-built matches the design.
Capped from 9 to 8. Accepting it does not accept the level it claims.
Decline this one instead
The proposal, step by step
8
band 7.2–8.5
superseding 8 (7.6–8.3)
- Published score stands at 8.
- A claim at level 9 is capped to 8: this kind of document cannot support more.
- The strongest supported level in the queue is 8, from 1 document.
- The evidence corroborates the published score without advancing it.
- Band set at ±0.8 on 1 corroborating source.
Reproducible on purpose. The weighting table is published, the same documents produce the same proposal for every issuer, and a reviewer who departs from it has to say so in the narrative. That is a weaker claim than a model that predicts outcomes, and a much more defensible one.