Offerings
Filed for qualification
The checks that matter are mechanical: does the raise fit under the exemption claimed, and does the instrument fit the TRL somebody signed. Both are recomputed here against the score as it stands today rather than as it stood when the offering was filed.
In the queue
Platform operations only- Reg CF
Cascade Salt Integral Loop
Cascade Integral Loop, second tranche
A convertible position in the salt loop program, released against the integral demonstration and the permit application.
- Raise
- $2,400,000
- Instrument
- Convertible note
- Minimum
- $500
- Published TRL
- Level 5, permitting Convertible note
- Filed
- Sep 9, 2026
Use of proceeds
Integral loop operating campaign, the construction permit application, and the corrosion coupon program at the national laboratory.
The rail fits the raise and the instrument fits the published score.
You are working as a TRL reviewer. Qualification is platform operations’ decision.